“The median blowup factor turns out to be exactly 1x for this dataset, whereas the mean blowup factor is 1.81x.”
Engineers estimate the typical task correctly. The schedule dies on the few tasks that blow up by 10x. Adding up estimates hides that tail, and managers sum them anyway because a sum fits on a slide. The gut feeling that says double it is better math than the spreadsheet.