“Moltex projects that a single 300 MW SSR-W could run for its full 60-year life on recycled fuel from about 260,000 used CANDU bundles.”
Pulling 90 percent of the long-lived transuranics out of real spent fuel in a day is a genuine result. The reactor that eats the output does not exist yet. Sixty-year projections from a company that has not built the thing are marketing, not engineering. Worth watching, worth ignoring the press release.