↓ Skip to main content

“By the end of 2024, we’re aiming to continue to grow our infrastructure build-out that will include 350,000 NVIDIA H100 GPUs as part of a portfolio that will feature compute power equivalent to nearly 600,000 H100s.”

Kevin Lee, Adi Gangidi and Mathew Oldhamengineering.fb.com ↗

Meta built two clusters of 24,576 H100s each, one on Ethernet and one on InfiniBand, to train Llama 3. Out of the box the big clusters ran at 10% to 90% utilization, while small ones hit 90% without trying. Fixing it took scheduler, routing and NCCL changes. The bottleneck at this scale is the network, and NVIDIA sells that too.